世联翻译公司完成机电“空气特性操作说明”英文翻译
时间:2020-04-20 08:45 来源:未知 作者:dongli 点击:次
世联翻译公司完成机电“空气特性操作说明”英文翻译
[Safety Instructions]
The system is dedicated test equipment for laboratory. Prior to use, make sure the operator has mastered the steps and special handling method of safe operation, and use it by the correct operation method!
一、 1. System operating environment
a) Indoor temperature <60 °C, > -20 °C; non-exposure under the sunshine;
b) Humidity> 10%, <70%; non-watering or spraying;
c) Non-corrosive environments;
d) When installing the workpiece, avoid collision with external devices or beating it;
二、 2. System structure
a) System structure
1) Computer control box: including computer cabinet, computer, main electric control cabinet and other ancillary equipment
2) American Standard box: including American Standard box, stand, stepper motors, cylinders and related mechanisms
3) European Standard box: including American Standard box, stand, stepper motors, cylinders and related mechanisms
b) Description of key parts and components:
i. The system is driven by the stepper motor, and stepper motor controller is in electrical control box;
ii. The systems provides multiple security measures, such as, power overload protection, power leakage protection, control power and cleaner power isolation, AC and DC isolation to ensure system safety;
三、 3. Operation steps
a) Operation step flowchart
Power on Complement the testing readings
Select the testing standard Hole plate is released.
Set up testing parameters Turn on the next hole plate.
Hole plate is on the original place. No Is every hole plate tested?
Yes
Dust cleaner preheating The calculation results form a report form.
Hole plate is loaded. Power on
b) Start testing machine power:
i. Insert the tester power plug into a properly grounded (good grounding specific criteria: when the human body contacts the metal of the tester, a similar feeling of static electricity hit will not occur. Through measuring by a multi-meter, the AC voltage between the equipment metal and the body is lower than 10v) socket, and the maximum withstand power is 2Kw;
ii. The dust cleaner power will be connected to the specified power outlet;
iii. Open the leakage protection switch of the electrical control box, the system's power is on; open the control computer, and open the power meter power Inspect whether the related equipment is properly displayed. If an error or exception, please switch off the power off and unplug the power plug (unplug the control power and the vacuum plugs) to confirm whether the air switch is opened and whether the fuse is burning, having a professional technician check; meanwhile, recognize that the gas source is turned on, and check whether the compression air is turned on.
iv.
c) Open the control software and enter the main interface (below):
d) Select 【TestPlatForm】—>【AirPerformance】, select the testing standard, Click on the picture to select the test criteria, and enter the next step.
e) Select the hole position and enter the next step.
f) Set up testing parameters, select the testing procedure and enter the next step.
g) Confirm the test procedures and related parameter settings, after that, click [Execute] to start the test. The test will be done automatically, without human intervention. To stop the test, click [Stop].
1. Control area for the test 2. Parameters test area
3. Hole position display area 4. Real-time information display area
5. Curve display of the test results 6. Pressure curve real-time display area
7. Data display area of the test result
After the test is completed, click [ToExcel] and the test results will be displayed in the form of test report in the Excel table.
The program will automatically save the test results in a database after the test is completed in order to keep track.
h) In the main interface, click [Query Platform] -> [History Data] to enter historical data query interface.
With the date, number and so on as the conditions, query the test data.
i) In the main interface, click [Settings] -> [Program Edit] to enter the editing interface of test program.
You can write test programs, and also modify and delete the existing test programs.
The test program will be stored in the database.
j) Click 【Tools】—>【Test Tools】in the main interface to enter the tool interface.
1. Parameter query area: You can query the negative pressure, dust cleaner voltage, current, power, frequency, barometric pressure, air temperature and humidity and so on.
2. Control area of movement mechanism: It can control click rotation in the AB boxes, cylinder actions and dust cleaner power source.
k) After the end of the test, please turn off the air supply, computer, dust cleaner power and control box power.
四、 4. Safety precautions and problem treatment:
a) Non-professional operators are not allowed to open the electronic control box to prevent electric shock! Before opening the electrical control box, always confirm that electric control box power is 220v and the dust cleaner power outlets are unplugged;
b) In exceptional cases, please press the emergency stop button! ! Remember!
c) Turn on switches in the electrical control box. Please be careful not to touch the other part of the circuit, or likely to cause an electric shock!
d) Before start, make sure that there are no extra objects on the test bench.
e) After the test is completed, the system will automatically stop.
Suzhou Zhuwei Electronic Technology Co., Ltd.
2012-02-01
世联翻译-让世界自由沟通!专业的全球语言翻译供应商,上海翻译公司专业品牌。丝路沿线56种语言一站式翻译与技术解决方案,专业英语翻译、日语翻译等文档翻译、同传口译、视频翻译、出国外派服务,加速您的全球交付。
世联翻译公司在北京、上海、深圳等国际交往城市设有翻译基地,业务覆盖全国城市。每天有近百万字节的信息和贸易通过世联走向全球!积累了大量政商用户数据,翻译人才库数据,多语种语料库大数据。世联品牌和服务品质已得到政务防务和国际组织、跨国公司和大中型企业等近万用户的认可。 |