手机版
1 2 3 4
首页 > 翻译团队 > 专业翻译公司 >
专业翻译公司

世联翻译公司完成天气新闻英文翻译

Unitrans世联

世联翻译公司完成天气新闻英文翻译

 
Nature Gas-Distributor Energy Project Status Report 201407
-- 【Guangzhou Wanbo Central Business District】Plans to Build Natural Gas Distributed Energy Station  
-- 【GuangdongZhaoqing New District Distributed Energy Station】No. 2 Energy Network Station: Trail Operation at the End of July
-- 【Qingdao Excellence•Century Center】Reached Strategic Operation with Taineng Natural Gas
-- 【Distributed Energy Station of People’s Hospital, Tinghu District, Yancheng】Received the Examination and Approval from Jiangsu Development and Reform Commission
-- 【Guangzhou Aotou Natural Gas Distributed Energy Station】Project Started


Guangzhou Wanbo Central Business District Plans to Build Natural Gas Distributed Energy Station
2014-7-15

A report of Yangcheng Evening News learned from Guangzhou Municipal Development and Reform Commission that Guangzhou Wanbo Central Business District’s plan of building a natural gas distributed energy station project, which showed the project to the public yesterday. The public can propose written opinions to Guangzhou Municipal Development and Reform Commission or Guangzhou International Engineering Consulting Corp. in autonym within 5 working days after the project publicity. 



It is learned that the total building scale of the project is as follows: 6 stand-alone generating capacity (58.38MW) and 9.73MW gas engine, which are connected to local power grid nearby with 110kV primary voltage, with supporting cold and heat pipe network constructed. The Energy Station is composed of rooms including internal combustion engine room (power island), high voltage distribution room, low voltage distribution room, monitor room, control room, and heating, ventilation and chemical water workshop, with the area of 5500m2 and layout of four floors.
 



This project provides medium pressure steam, low-pressure steam, domestic hot water, heating medium water and chilled water for hotels, apartments and shops with the area of more than 1.5 million square meters within Panyu Wanbo business district, and provides power for the electrical load nearby as a public power plant.






Birth of Guangdong Zhaoqing New District “Energy Heart”: The Frist Natural Gas Distributed Energy Station
2014-7-7



The waste heat generated by the exhaust gas after power generation with natural gas, recycled by hot-water heater, can help to produce the domestic hot water which can be supplied for commercial office buildings, hotels, hospitals and catering industry nearby… Recently, the Phase 1 main building of construction No. 2 Energy Network Station, the first distributed energy station located in Zhaoqing New District, has been completed, and the trial operation will be conducted at the end of July. The birth of this green “Energy Heart” means Zhaoqing New District has taken an essential step in terms of the “green low carbon” development concept.



“Energy heart” complementary energy available 



It is learned that Zhaoqing New District deems “green low carbon” as the development model, and more than two years after it starts the planned construction, Zhaoqing New District has started the green development model in terms of space arrangement, ecosystem, low-carbon traffic, engineering construction and technology application. On March 1 this year, it began to implement Zhaoqing New District Natural Gas Distributed Energy Concentrated Energy Supply Administration Method, and the first distributed energy station, i.e. No. 2 Energy Network Station was officially started.



What is a distributed energy station? Zuo Wensheng, the General Manager of Zhaoqing ENN Clean Energy Company which undertook Zhaoqing New District Distributed Energy Station, told the reporter that Zhaoqing New District Distributed Energy Station mainly used natural gas as the fuel, and achieves energy gradient utilization with combined cooling heating-power cogeneration, and achieves. “It is like an ‘energy heart’, and is operated through power grid and natural gas pipe networking. It can provide energy services such as provision of cold, hot and domestic hot water to users within an area. The core advantage is complementary energy utilization.” For example, during the process of traditional power generation, the exhaust gas with rich thermal energy runs off naturally, causing the low energy utilization rate. However, the distributed energy station is able to make use of the exhaust gas waste heat generated by natural gas after power generation, to help to produce domestic hot water, or transport cool air after it is absorbed by bromine refrigerator for refrigeration. In due course, the households in the new district do not need to install air-conditioners and water heater. By pressing air conditioning switches, they will have cool air or warm air, and by opening the taps, they will have hot water.



Zuo Wensheng believes that at present the energy utilization rates of some traditional energy supply methods are low, i.e. just between 40% and 50%. However,  the Distributed Energy Station can avoid power transmission and transformation loss and heat transmission loss, with the comprehensive energy utilization rate above 80%。



The first area which uses distributed energy in a wide scope in China 



The area of Zhaoqing New District is about 115 square kilometers. According to the plan, there will be 23 sub-energy station built, covering Guicheng Street, Guangli Street, Phoenix Town, Lotus Flower Town and Yong’an Town. Connected by the pipe network, these sub-energy stations will compose New District Energy Micro-network, with energy stations save energy, and the energy utilization between stations can be supplemented mutually. It is learned that distributed energy technology has been applied in China, but they are single applications.  Zhaoqing New District is the first case in China to apply combined supply of cooling, heating and power in such a large scope.



No. 2 Energy Network Station is one of the five distributed energy network stations constructed in the core area of Zhaoqing New District in Phase 1. The construction started in March 1, which mainly supply energy for Beijing Normal University Zhaoqing Affiliated School and the administrative and commercial buildings 1.5 kilometers around. 



On July 4, the report saw from the construction site that this Energy Network Station was a three-floor construction structure. At present, the main construction was finished, and the energy supply equipment was being installed. According to Qiu Yuanming, the manager of Planning and Development Department of the Energy Network Station undertaking company, the construction area of No. 2 Energy Network Station Phase 1 is more than 1000 square meters, with the investment of more than RMB 30 million yuan. The trial operation can be conducted at the end of July. At present, it is mainly used to transmit cool air to Beijing Normal University Zhaoqing Affiliated School, and it will be put into use officially on September 1. It is also planned to start building No. 1 and No. 5 Energy Network Stations within this year.



Ninety percent of carbon dioxide emission to be reduced 



It is learned that after the construction of the distributed energy system in New District is finished, the total energy utilization consumption will be controlled, the energy efficiency will be up apparently, the energy structure will be reasonable and balanced, and the green low carbon will be truly achieved. GDP energy consumption will be reduced by 55.2%, and carbon dioxide emission will drop by 90%.



In accordance with Zhaoqing New District Energy Planning (2013—2030), until 2030, the total energy consumption in New District will be within 1.5 million ton standard coal. The New District will use a hundred percent of clean energy, and the renewable energy utilization will account for more than 20% of the total energy consumption. The unit GDP energy consumption will be lower than 0.3 ton standard coal/ten thousand yuan. Carbon emission intensity will be lower than 0.2 ton/ten thousand yuan.



Zuo Wensheng said that “Government departments, as the energy consumption organizations, can also enjoy the reduction of energy investment and energy consumption fees just as general energy consumption enterprises and residence. Meanwhile, green low carbon energy operation can fully meet the requirements of green low carbon development of the government, and truly realize the life in an ideal and livable city. ”
Unitrans世联翻译公司在您身边,离您近的翻译公司,心贴心的专业服务,专业的全球语言翻译与信息解决方案供应商,专业翻译机构品牌。无论在本地,国内还是海外,我们的专业、星级体贴服务,为您的事业加速!专业翻译公司,北京翻译公司,上海翻译公司,英文翻译,日文翻译,韩语翻译,翻译公司排行榜,翻译公司收费价格表,翻译公司收费标准,翻译公司北京,翻译公司上海。
笔译案例
同传案例
本地化案例
公司新闻
  • “贵司提交的稿件专业词汇用词准确,语言表达流畅,排版规范, 且服务态度好。在贵司的帮助下,我司的编制周期得以缩短,稿件语言的表达质量得到很大提升”

    华东建筑设计研究总院

  • “我单位是一家总部位于丹麦的高科技企业,和世联翻译第一次接触,心中仍有着一定的犹豫,贵司专业的译员与高水准的服务,得到了国外合作伙伴的认可!”

    世万保制动器(上海)有限公司

  • “我公司是一家荷兰驻华分公司,主要致力于行为学研究软件、仪器和集成系统的开发和销售工作,所需翻译的英文说明书专业性强,翻译难度较大,贵司总能提供优质的服务。”

    诺达思(北京)信息技术有限责任公司

  • “为我司在东南亚地区的业务开拓提供小语种翻译服务中,翻译稿件格式美观整洁,能最大程度的还原原文的样式,同时翻译质量和速度也得到我司的肯定和好评!”

    上海大众

  • “在此之前,我们公司和其他翻译公司有过合作,但是翻译质量实在不敢恭维,所以当我认识刘颖洁以后,对她的专业性和贵公司翻译的质量非常满意,随即签署了长期合作合同。”

    银泰资源股份有限公司

  • “我行自2017年与世联翻译合作,合作过程中十分愉快。特别感谢Jasmine Liu, 态度热情亲切,有耐心,对我行提出的要求落实到位,体现了非常高的专业性。”

    南洋商业银行

  • “与我公司对接的世联翻译客服经理,可以及时对我们的要求进行反馈,也会尽量满足我们临时紧急的文件翻译要求。热情周到的服务给我们留下深刻印象!”

    黑龙江飞鹤乳业有限公司

  • “翻译金融行业文件各式各样版式复杂,试译多家翻译公司,后经过比价、比服务、比质量等流程下来,最终敲定了世联翻译。非常感谢你们提供的优质服务。”

    国金证券股份有限公司

  • “我司所需翻译的资料专业性强,涉及面广,翻译难度大,贵司总能提供优质的服务。在一次业主单位对完工资料质量的抽查中,我司因为俄文翻译质量过关而受到了好评。”

    中辰汇通科技有限责任公司

  • “我司在2014年与贵公司建立合作关系,贵公司的翻译服务质量高、速度快、态度好,赢得了我司各部门的一致好评。贵司经理工作认真踏实,特此致以诚挚的感谢!”

    新华联国际置地(马来西亚)有限公司

  • “我们需要的翻译人员,不论是笔译还是口译,都需要具有很强的专业性,贵公司的德文翻译稿件和现场的同声传译都得到了我公司和合作伙伴的充分肯定。”

    西马远东医疗投资管理有限公司

  • “在这5年中,世联翻译公司人员对工作的认真、负责、热情、周到深深的打动了我。不仅译件质量好,交稿时间及时,还能在我司资金周转紧张时给予体谅。”

    华润万东医疗装备股份有限公司

  • “我公司与世联翻译一直保持着长期合作关系,这家公司报价合理,质量可靠,效率又高。他们翻译的译文发到国外公司,对方也很认可。”

    北京世博达科技发展有限公司

  • “贵公司翻译的译文质量很高,语言表达流畅、排版格式规范、专业术语翻译到位、翻译的速度非常快、后期服务热情。我司翻译了大量的专业文件,经过长久合作,名副其实,值得信赖。”

    北京塞特雷特科技有限公司

  • “针对我们农业科研论文写作要求,尽量寻找专业对口的专家为我提供翻译服务,最后又按照学术期刊的要求,提供润色原稿和相关的证明文件。非常感谢世联翻译公司!”

    中国农科院

  • “世联的客服经理态度热情亲切,对我们提出的要求都落实到位,回答我们的问题也非常有耐心。译员十分专业,工作尽职尽责,获得与其共事的公司总部同事们的一致高度认可。”

    格莱姆公司

  • “我公司与马来西亚政府有相关业务往来,急需翻译项目报备材料。在经过对各个翻译公司的服务水平和质量的权衡下,我们选择了世联翻译公司。翻译很成功,公司领导非常满意。”

    北京韬盛科技发展有限公司

  • “客服经理能一贯热情负责的完成每一次翻译工作的组织及沟通。为客户与译员之间搭起顺畅的沟通桥梁。能协助我方建立专业词库,并向译员准确传达落实,准确及高效的完成统一风格。”

    HEURTEY PETROCHEM法国赫锑石化

  • “贵公司与我社对翻译项目进行了几次详细的会谈,期间公司负责人和廖小姐还亲自来我社拜访,对待工作热情,专业度高,我们双方达成了很好的共识。对贵公司的服务给予好评!”

    东华大学出版社

  • “非常感谢世联翻译!我们对此次缅甸语访谈翻译项目非常满意,世联在充分了解我司项目的翻译意图情况下,即高效又保质地完成了译文。”

    上海奥美广告有限公司

  • “在合作过程中,世联翻译保质、保量、及时的完成我们交给的翻译工作。客户经理工作积极,服务热情、周到,能全面的了解客户的需求,在此表示特别的感谢。”

    北京中唐电工程咨询有限公司

  • “我们通过图书翻译项目与你们相识乃至建立友谊,你们报价合理、服务细致、翻译质量可靠。请允许我们借此机会向你们表示衷心的感谢!”

    山东教育出版社

  • “很满意世联的翻译质量,交稿准时,中英互译都比较好,措辞和句式结构都比较地道,译文忠实于原文。TNC是一家国际环保组织,发给我们美国总部的同事后,他们反应也不错。”

    TNC大自然保护协会

  • “原英国首相布莱尔来访,需要非常专业的同声传译服务,因是第一次接触,心中仍有着一定的犹豫,但是贵司专业的译员与高水准的服务,给我们留下了非常深刻的印象。”

    北京师范大学壹基金公益研究院

  • “在与世联翻译合作期间,世联秉承着“上善若水、厚德载物”的文化理念,以上乘的品质和质量,信守对客户的承诺,出色地完成了我公司交予的翻译工作。”

    国科创新(北京)信息咨询中心

  • “由于项目要求时间相当紧凑,所以世联在保证质量的前提下,尽力按照时间完成任务。使我们在世博会俄罗斯馆日活动中准备充足,并受到一致好评。”

    北京华国之窗咨询有限公司

  • “贵公司针对客户需要,挑选优秀的译员承接项目,翻译过程客户随时查看中途稿,并且与客户沟通术语方面的知识,能够更准确的了解到客户的需求,确保稿件高质量。”

    日工建机(北京)国际进出口有限公司